Inside the home, the previous fixes were removed
to show the water damage that had been happening
for years.
With the old roofing torn off and the rot at the
bottom of the door unit removed,
the exterior repair can now be started.
Ice and water sheild is rolled over the top and
extended under the door sill.
Inside, the R-30 fiberglass insulation and reflective foam board can now be installed for a huge improvement to the R value, followed by new drywall and crown moulding. drywall and crown
The new drywall on the ceiling is
finished and painted smooth as
glass. Fresh paint is applied on
the walls and new crown.
The flat roof was covered with a 15 year membrane. The side lights were rebuilt and flashed correctly. A new screen door was added to complete the renovation. No more leaks!