A garage door was cut and a sufficient header was installed to code. Notice the upper and lower floors are already removed.
The upper deck is now installed with doubled 18" LVL beams to provide the main support. The upper deck is complete
with a 3/4" tongue and groove sub-floor. All the windows have been removed, and new energy efficient windows installed. The electrical service was completely replaced to comply with code and provide adequate lighting.
With all of the structural components installed, the
board and batten siding can be attached. No
maintenence white aluminum is installed to the old
fascia with vented white metal soffit to "set off"
the upper trim work. The window, base and corner
trim is all Hardie board that will never rot or need be
repainted.
The transformation is complete.
New garage and entryway doors
are installed. The cement skirting
and pad are finished and sealed.
Decorative lights accent the garage
door.