EGR Bathroom Remodel

This bathroom remodel was done in winter of 08'. The existing bathroom was completely gutted to the studs. New drywall, sub floor and heating ducts were installed. A whirlpool tub was added with a custom glass block wall. 16" tile was included in a spiral pattern throughout the bathroom as well as a new vanity and water closet.

 

For pictures of this project, vist

  • EGR-Bathroom Remodel

  • 1940's Milk Barn Renovation
    This 1940’s milk barn was renovated in spring of 09'. This barn was neglected for years and had many issues to bring to code. The second floor was immediately removed as well as the windows. A new main beam was installed to allow a 24' clear span on the first floor and support a new upper deck. A garage door opening was cut along with new window openings. Board and batten siding was added with white Hardie board accents. All fascia was wrapped and new soffit included to make this barn a showpiece.

     


    For pictures of this project, vist

  • Milk Barn Renovation

  • Bathroom Remodel
    New addition remodel was added in winter of 2008. The new space included a mudroom hallway and bathroom. Custom floor tile, heated in the bathroom and woodwork was added throughout the entire addition.  Cherry medicine chests and bathroom base cabinets was topped with his and hers porcelain sinks and premium laminate counter top. Shower was tiled with subway tiles and glass accents over a new Kohler cast iron tub.

    For pictures of this project, vist

  • Tile Bathroom Gallery

  • Flat Roof Repair & Remodel
    We were called after 8 years of fixes and leaks in a sitting room under a flat roof. Complete removal of old plaster and insulation was commenced with our dust free system. The upper flat roof system was removed and discarded, new R-30 insulation was added with reflective rigid insulation panels, old door and sidelights were removed on the second floor, a water and ice shield were incorporated for the first waterproofing layer and a 15 year guaranteed membrane was installed over all completing the water proofing. The door and sidelights were rebuilt and a new screen door was added. Underneath new drywall and crown molding was installed followed by two fresh coats of paint.

     


    For pictures of this project, vist

  • Flat Roof Remodel
  • Commercial Suspended Acoustical Ceiling
    PHB Construction was called to install a suspended ceiling during Christmas break in winter of 09’. This was a job to bring a Sparta middle school up to fire code before the kids came back from vacation. Edging was installed into cement block and new energy efficient lights were set in the grid pattern producing a safe, brighter and fresh upgrade.

     


    For pictures of this project, vist

  • Commercial Suspended Ceiling
  • Small Soffit Repair
    We are more than happy to come out and do a small repair. This soffit repair was done after a wind storm blew out a section of soffit. The metal fascia was replaced and the new soffit installed.

     


    For pictures of this project, vist

  • Small Soffit Repair
  • Water Damaged Basement
    Like so many in the past summer of '09 PHB Construction was called to a water damaged basement. The drywall was damaged and moldy 2' up around the perimeter of the basement bedroom. With our dust free system we contained the area with plastic and created negative air. The old water damaged drywall and insulation was removed and replaced with new moisture resistant wallboard and fiberglass insulation. The drywall was then finished to blend with the existing drywall.

     