Remodeling Projects
EGR Bathroom Remodel
This bathroom remodel was done in winter of 08'. The existing bathroom
was completely gutted to the studs. New drywall, sub floor and heating
ducts were installed. A whirlpool tub was added with a custom glass
block wall. 16" tile was included in a spiral pattern throughout
the bathroom as well as a new vanity and water closet.
For pictures of this project, vist
EGR-Bathroom Remodel
1940's Milk Barn Renovation
This 1940’s milk barn was renovated in spring of 09'. This barn
was neglected for years and had many issues to bring to code. The second
floor was immediately removed as well as the windows. A new main beam
was installed to allow a 24' clear span on the first floor and support
a new upper deck. A garage door opening was cut along with new window
openings. Board and batten siding was added with white Hardie board
accents. All fascia was wrapped and new soffit included to make this
barn a showpiece.
For pictures of this project, vist
Milk Barn Renovation
Bathroom Remodel
New addition remodel was added in winter of 2008. The new space included
a mudroom hallway and bathroom. Custom floor tile, heated in the bathroom
and woodwork was added throughout the entire addition. Cherry medicine chests and bathroom base cabinets was topped with his
and hers porcelain sinks and premium laminate counter top. Shower was
tiled with subway tiles and glass accents over a new Kohler cast iron
tub.
For pictures of this project, vist
Tile Bathroom Gallery
Flat Roof Repair & Remodel
We were called after 8 years of fixes and leaks in a sitting room under
a flat roof. Complete removal of old plaster and insulation was commenced
with our dust free system. The upper flat roof system was removed and
discarded, new R-30 insulation was added with reflective rigid insulation
panels, old door and sidelights were removed on the second floor, a
water and ice shield were incorporated for the first waterproofing layer
and a 15 year guaranteed membrane was installed over all completing
the water proofing. The door and sidelights were rebuilt and a new screen
door was added. Underneath new drywall and crown molding was installed
followed by two fresh coats of paint.
For pictures of this project, vist
Flat Roof Remodel
Commercial Suspended Acoustical Ceiling
PHB Construction was called to install a suspended ceiling during Christmas
break in winter of 09’. This was a job to bring a Sparta middle
school up to fire code before the kids came back from vacation. Edging
was installed into cement block and new energy efficient lights were
set in the grid pattern producing a safe, brighter and fresh upgrade.
For pictures of this project, vist
Commercial Suspended Ceiling
Small Soffit Repair
We are more than happy to come out and do a small repair. This soffit repair was done after a wind storm blew out a section of soffit. The metal fascia was replaced and the new soffit installed.
For pictures of this project, vist
Small Soffit Repair
Water Damaged Basement
Like so many in the past summer of '09 PHB Construction was called to a water damaged basement. The drywall was damaged and moldy 2' up around the perimeter of the basement bedroom. With our dust free system we contained the area with plastic and created negative air. The old water damaged drywall and insulation was removed and replaced with new moisture resistant wallboard and fiberglass insulation. The drywall was then finished to blend with the existing drywall.
For pictures of this project, vist
Water Damaged Basement